Lower running cost, higher output and fewer stoppages from the plant you already have. For plants we delivered and for existing plants from other suppliers.
Energy cost
Energy per tonne of product: heat recovery, burner and air systems, insulation, compressed air.
Product recovery
Product lost to the stack, filters and spillage, recovered with high‑efficiency cyclones and better transfer.
Capacity
The actual bottleneck identified and removed, to raise output without a new plant.
Product quality
Moisture, particle size and consistency brought back within specification.
Emissions
Dust emissions brought within limits, with margin for tighter regulations ahead.
Reliability and cleaning
Fewer breakdowns, shorter changeover and cleaning, with downtime recorded and its cost known.
1
Scope
A call or site visit to agree what to measure and what you want to achieve.
2
Measure
Two to five days on site, measuring the plant under normal production.
3
Report
Measured figures and improvement options, each costed with a payback period.
4
Implement
We carry out the options you choose, planned around your production or shutdown.
Service agreements
Scheduled inspection and maintenance, so problems are found before they stop production.
Spare parts
For the equipment we supply, with lead times stated.
Upgrades and retrofits
Recovery and emission systems, heat recovery, atomizer and control upgrades, capacity increases.
Shutdown work
Scopes planned and priced ahead, completed inside your shutdown window.
Operator training
For new staff, a new product or a process change.
Breakdown support
Engineers and site teams from Chonburi when production has stopped.