TSK Powder Technical Center

Home / Applications / Tradewinds Plantation

Advanced Cyclone Systems (ACS)

Case study · Emission control · ACS

Palm oil mill boiler emission control in Malaysia

ACS designed and supplied a ReCyclone MH system to cut particulate emissions from a palm waste boiler at Tradewinds’ Kuala Suai palm oil mill in Bintulu, Sarawak, Malaysia, from 500 mg/Nm³ to under 150 mg/Nm³.

Download PDF (ACS) ↓
ACS cyclone system at Tradewinds Plantation, Bintulu, Malaysia

The problem

Palm oil mills burn mesocarp fibre, palm kernel shell and empty fruit bunches in water tube boilers. Multicyclones after the boilers often exceed limits because of low efficiency and variable fuel. Malaysia’s Department of Environment set a limit of 150 mg/Nm³ at 12% CO₂ for all plants from 2019.

The solution

For the mill’s 35 t/h boiler (137 620 m³/h at 320 °C), ACS designed a mechanical ReCyclone system of 24 Hurricane HR ø1000 mm cyclones in six batteries of four, each with a V‑type mechanical recirculator. The recirculator returns uncaptured fines to the cyclone, cutting emissions by a further 40–60%, with no temperature limit and few moving parts.

General arrangement of the ReCyclone MH system – Palm oil mill boiler emission control in Malaysia
General arrangement of the ReCyclone MH system
ReCyclone MH system, second view – Palm oil mill boiler emission control in Malaysia
ReCyclone MH system, second view
Particle size distribution used in the simulation – Palm oil mill boiler emission control in Malaysia
Particle size distribution used in the simulation
Predicted grade efficiency curves – Palm oil mill boiler emission control in Malaysia
Predicted grade efficiency curves
Design basis
FuelPalm mesocarp fibre and palm kernel shell
Boiler35 t/h water tube
Actual flow rate137 620 m³/h (wet)
Temperature320 °C
Inlet concentration500 mg/Nm³

Result

Verified results confirm emissions under 100 mg/Nm³ at 12% CO₂ for inlet loads above 500 mg/Nm³. ACS was then asked to supply three more systems for other mills in Malaysia.

Results
Malaysian limit (from 2019)150 mg/Nm³ at 12 % CO₂
Guaranteed emissions< 150 mg/Nm³
Expected emissions< 100 mg/Nm³
Expected pressure drop< 1.25 kPa

Source: Advanced Cyclone Systems (ACS) case study. Figures and photos: ACS.

Explore further

ACS

Technology by Advanced Cyclone Systems (ACS)

Numerically optimized Hurricane and ReCyclone systems for powder recovery and emission control. T.S.K. Engineering is ACS's exclusive partner in Thailand and engineers, builds and installs ACS systems.

ACS cyclones →Discuss your powder recovery or emissions

Contact our engineers

+66 81 978 8389 · contact@tskengineering.co.th

Talk to an engineer